Product: VDRPro
Applies to: Users with the Manager Plus role
You can determine whether reviewers can view the date and time each document was added to the VDR, as well as the date and time that it was most recently updated.
Note: The terms VDR and exchange are used interchangeably in Intralinks products.
I want to
- Hide/show document creation and modification dates to reviewers
Steps
- From within the VDR, from the Settings menu, select Exchange Settings.
- In the Document area, click Management.
- Select one of the following options:
- To show the document creation and modification dates, turn the Hide Document Creation and Modification Dates from Reviewers setting off (the setting will be gray).